Scope Of Work

Excavation, Backfilling, and Construction Works

The work includes several key construction activities such as excavation, backfilling, and the supply of base course materials. In addition, the project involves the installation of pipework, blacksmithing, carpentry, and concrete works to ensure the successful completion of the infrastructure.

Key components of the work:

  • Excavation and Backfilling: Precise excavation and careful backfilling to create a stable foundation for the project.
  • Base Course Materials: Supplying and laying appropriate base materials to ensure a solid foundation.
  • Pipework: Installation of necessary pipes for drainage, water supply, and other utilities.
  • Blacksmithing and Carpentry: Fabrication of metal and wood components for structural and aesthetic purposes.
  • Concrete Works: Pouring and finishing concrete for foundations, walkways, and other necessary surfaces.

This comprehensive work ensures that the project foundation is stable, functional, and ready for further construction, maintaining high standards of quality throughout.

  • Date
  • Client
    Lucid
  • Duration
    18 Months
  • Place
    Sa'abar
  • Estimation
    18,000,000