Scope Of Work
Cutting and Backfilling Work at King Abdul Aziz Park Project
The cutting and backfilling work at the King Abdul Aziz Park project involved meticulous excavation and material placement to prepare the site for future construction. This work was essential to ensure a stable and level foundation for the park’s infrastructure, following the required technical specifications and quality standards.
Key aspects of the work included:
- Excavation (Cutting): Precisely removing soil and materials from specific areas to achieve the desired depth and shape, ensuring proper land contours.
- Backfilling: Carefully placing and compacting the soil and materials in layers, restoring the excavated area and ensuring the ground is stable and ready for the next phase of construction.
- Quality Assurance: Ongoing monitoring and testing to ensure that the backfilling met the required compaction levels and adhered to the project’s specifications.
This critical work at King Abdul Aziz Park ensures a solid foundation for the park’s development, showcasing Watan SAS’s commitment to excellence in large-scale civil engineering projects.