Isolation Work in King Abdullah Bridge

Scope Of Work

Import and Installation of Isolation Material

The work involves the import and installation of specialized isolation material made of bitumen with double thickness options of 4mm and 5mm. This material is applied to ensure high-quality insulation and protection, meeting project standards and specifications.

Key aspects of the work:

  • Material Import: Procuring high-grade bitumen insulation materials for the project.
  • Double Thickness Application: Installing bitumen with 4mm and 5mm thickness to enhance durability and effectiveness.
  • Precision Installation: Ensuring accurate placement and adherence to quality standards during the installation process.

This work is essential for providing robust insulation, contributing to the durability and efficiency of the overall project.

 

 

  • Date
  • Client
    Isolation Work in King Abdullah Bridge
  • Duration
    18 Months
  • Place
    Jeddah
  • Estimation
    45 Million SAR